What’s included in every Synergas installation?

Site assessment & consultation

We evaluate your site and discuss your needs to design the safest, most efficient installation.

Custom system design

Our engineers create a bespoke LPG installation plan tailored to your property and usage.

Qualified installation team

Certified specialists install your system professionally and with attention to detail.

From first call to certified handover

Installation Process

1
Requisition

Submit a request online or call our team.

2
Site Visit

A certified technician assesses your premises.

3
Installation

Typically completed within a day; crane used if required.

4
After‑Sales Support

24/7 support, inspections, and future maintenance.

generate an image for Technicianse

Cyprus Legislative Safety Distances

Regulations & Safety Distances
Maximum tank capacity (L) Above-ground Underground Min. distance from buildings(m) Min. distance between tanks (m)
Up to 500 0 3 0 1.5
500–2,500 3 3 1 1.5
2,500–10,000 7.5 7.5 1 1.5
10,000–150,000 15 7.5 7.5 1.5

Meet Our Certified Installation Engineers

generate  picture pictures of an installation engineer photo-realistic posing for a profile picture
Andreas Savva Installation Engineer
generate  picture pictures of an installation engineer photo-realistic posing for a profile picture (1)
Giorgos Christou Installation Engineer
generate  picture pictures of an installation engineer photo-realistic posing for a profile picture (2)
Maria Ioannou Installation Engineer

Ready for a Safe Gas Installation?